Skip to content
Tuesday 21 April 2026
  • About JKNewMedia
  • Subscribe
  • Contact
JKNewsMedia
  • News
    • States News
    • National Affairs
    • International News
    • General News
  • Politics
  • Business & Economy
  • Climate Change
  • Health & Wellness
  • Sports
  • More
    • Faith & Society
    • Women & Society
    • Media Publicity
    • Column/Analysis
    • Community Journalism
  • English
  • News
    • States News
    • National Affairs
    • International News
    • General News
  • Politics
  • Business & Economy
  • Climate Change
  • Health & Wellness
  • Sports
  • More
    • Faith & Society
    • Women & Society
    • Media Publicity
    • Column/Analysis
    • Community Journalism
  • English
JKNewsMedia
News
News

Traffic Gridlock Engulfs Lagos Amid Independence Bridge Closure

 JKNM JKNMApril 2, 2025 2172 Minutes read0
FacebookTwitterWhatsAppLinkedInEmailLink

By Jemimah Wellington, JKNewsMedia Reporter 

LAGOS ROADS descended into turmoil on Wednesday, with commuters facing hours of congestion due to the sudden closure of the Independence Bridge for essential repairs.

The closure, which began on April 1, 2025, has crippled traffic in the city’s commercial heart, particularly on Victoria Island and Ikoyi, as residents struggled to navigate the overcrowded streets.

The two-month repair project is expected to last until the end of May, with significant disruptions predicted across major routes.

The closure of the Independence Bridge, which connects Victoria Island to Marina, terribly left commuters facing unexpected delays.

Many residents, still recovering from the two-day holiday, were caught off-guard by the gridlock, worsened by early morning rains that made an already tense situation even worse.

The resulting traffic jam caused severe delays, forcing people to either spend long hours commuting or resort to walking long distances.

For many drivers, the cost of the disruption has been steep.

A local driver, who chose to remain anonymous, shared his frustration, saying he had made a financial loss after being delayed in traffic. “I woke up at 4.00am, and I’m still on my second trip, when I should be on my fourth. This is a huge loss for me,” he explained.

The situation was similarly distressing for passengers. A commuter stuck at Falomo Bridge, detailed her experience: “I was stuck for over three hours. By the time I got to Obalende, passengers were queuing for vehicles. I’m exhausted, and I don’t know how I’ll manage the rest of the day.”

As the gridlock stretched throughout the day, the Federal Ministry of Works issued a statement from Olukorede Kesha, the Federal Controller of Works in Lagos, advising motorists to plan their journeys and seek alternative routes.

The closure, she explained, is necessary for critical maintenance and rehabilitation work on the bridge.

The Lagos State Government had previously issued an advisory on March 15, 2025, alerting residents to the upcoming closure.

Commissioner for Transportation, Oluwaseun Osiyemi, emphasised the need for alternative routes, especially for those travelling from Victoria Island to the mainland.

By Wednesday, alternative routes were already packed with frustrated motorists, and bottlenecks formed along streets like Lekki, Victoria Island, and Falomo Bridge.

Another motorist trying to leave Victoria Island, expressed his concern: “I left the Island at 2 ,00pm and was still stuck in traffic at 4.00pm. How will we survive this for two months?” Still, another female commuter described how a 15-minute journey had taken her nearly two hours.

For the duration of the repair works, alternative routes have been mapped out, including diversions from Ahmadu Bello Way to Victoria Island via Ozumba Mbadiwe Avenue and Akin Adesola Street.

Similarly, the section of the National Open University of Nigeria (NOUN) through Bonny Camp Bridge will also be closed.

The Lagos State Traffic Management Authority (LASTMA) is on hand to manage traffic flow, urging motorists to exercise patience during the project.

Tags
bridge closureLagos repairsLagos Traffic
Related posts
  • Related posts
  • More from author
News

BoI And RMRDC Seal Partnership To Boost Agricultural Value Chain And GDP

14:50April 21, 2026
News

CAPPA Urges Action To Safeguard Democracy Ahead Of 2027 Elections

12:28April 20, 2026
Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Read also
Breaking News

Tinubu Reshuffles Cabinet, Replaces Finance And Housing Ministers

18:24April 21, 2026
Business & Economy

Wema Bank Surpasses CBN Capital Requirement, Retains National Status

17:34April 21, 2026
National Affairs

INEC Flags Fake X Account Linked To Chairman, Cites Forensic Proof Of Disinformation

16:47April 21, 2026
Health & Wellness

Malaria Risk Persists As Only 44.9% Of Children Use Nets, NMEP Warns

15:46April 21, 2026

VIDEO

  • Politics
  • Business & Economy
  • States News
  • National Affairs
  • Climate Change
  • World & Diplomacy
  • Health & Wellness
  • Media & Journalism
jk_last_logo

Your Authentic News Platform

Your Authentic News Platform

  • Politics
  • Business & Economy
  • Climate Change
  • World & Diplomacy
  • Health & Wellness
  • States News
  • National Affairs
  • Media & Journalism
  • Politics
  • Business & Economy
  • Climate Change
  • World & Diplomacy
  • Health & Wellness
  • States News
  • National Affairs
  • Media & Journalism

© 2025 JKNewsMedia.  Powered By WinNet

  • About JKNewMedia
  • Privacy Policy
  • Advertise with us
  • Careers
  • Contact

© 2025 JKNewsMedia.  Powered By WinNet

  • About JKNewMedia
  • Privacy Policy
  • Advertise with us
  • Careers
  • Contact