Skip to content
Friday 16 January 2026
  • About JKNewMedia
  • Subscribe
  • Contact
JKNewsMedia
  • News
    • States News
    • National Affairs
    • International News
    • General News
  • Politics
  • Business & Economy
  • Climate Change
  • Health & Wellness
  • Sports
  • More
    • Faith & Society
    • Women & Society
    • Media Publicity
    • Column/Analysis
    • Community Journalism
  • English
  • News
    • States News
    • National Affairs
    • International News
    • General News
  • Politics
  • Business & Economy
  • Climate Change
  • Health & Wellness
  • Sports
  • More
    • Faith & Society
    • Women & Society
    • Media Publicity
    • Column/Analysis
    • Community Journalism
  • English
JKNewsMedia
Media Publicity
Media Publicity

Senate Committee Demands Swift Action on Delayed Bodo-Bonny Road Project

 JKNM JKNMApril 10, 2025 2012 Minutes read0
FacebookTwitterWhatsAppLinkedInEmailLink

By Jemimah Wellington, JKNewsMedia Reporter 

THE SENATE Committee on Works has called for accelerated progress on the long-awaited Bodo-Bonny Road, urging contractor Julius Berger Nigeria Plc to ramp up efforts and meet the December completion deadline.

During a weekend oversight visit to the 35.7-kilometre infrastructure project in Rivers State, committee members led by Senator Barinada Mpigi inspected construction milestones and acknowledged the scale of work already achieved.

The delegation, however, pressed for faster execution to match federal funding commitments.

“We are happy with the progress, but we expect more from Julius Berger, a company we have come to know as a giant in the construction industry,” said Senator Mpigi, reaffirming the Federal Government’s full financial support. “Now it is time for delivery.”

The Bodo-Bonny Road, under construction since 2014, has faced repeated delays due to complex environmental conditions. The route cuts across swampy terrain and tidal zones, making engineering work especially challenging.

Despite this, five kilometres have now been asphalted, with key bridges linking the mainland to Bonny Island already completed.

The committee mandated Julius Berger to intensify asphalting and infrastructure finishing works in time for a September progress review.

“This is not a one-time visit,” Mpigi added. “We will continue to monitor every stage of this project until it is delivered.”

Senator Patrick Ndubueze echoed these concerns, highlighting regional differences in terrain that complicate construction. “This is not the same as working in the South-East,” he remarked.

Accompanying the legislators on-site, Julius Berger’s Managing Director, Engr. Dr. Peer Lubasch, assured the team that the project could meet the end-of-year target, provided financing remains consistent.

He explained that low-lying, marshy land and tidal interference had required extended periods for the soil to stabilise before laying asphalt.

Lubasch confirmed that the road is already accessible for vehicular movement, and major structures—including three key bridges—are operational.

The Bodo-Bonny Road includes 13 bridges: three major spans, nine mini bridges, and one crossing over a pipeline.

These connect four local government areas in Rivers State and form the first-ever road link to Bonny Island.

Initiated under a tripartite agreement between the Federal Government, the Nigerian Liquefied Natural Gas (NLNG) company, and Julius Berger Nigeria Plc, the project features significant bridgeworks, including the Afa Creek Bridge (530m), Nanabie Creek Bridge (640m), and a 750-metre river bridge over the Opobo Channel.

Once completed, the Bodo-Bonny Road is expected to transform the region by easing transport, expanding economic access, and bolstering critical oil and gas infrastructure connections on Bonny Island.

Tags
InfrastructureJulius Berger Road constructionNigerian Senate
Related posts
  • Related posts
  • More from author
Media Publicity

Tinubu Approves $1.42bn, N5.57tn NNPC Debt Write-Off to Reset Oil Sector Finances

10:20December 30, 2025
Media Publicity

Warri Explosion: Escravos–Lagos Pipeline Fully Restored – NNPC

08:23December 30, 2025
Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Read also
Column/Analysis

‘The Insight’ We Need 

07:23January 16, 2026
Sports

2026WAFCON: Nigeria Drawn In Group C With Zambia, Egypt And Malawi

19:20January 15, 2026
Business & Economy

Nigeria’s Inflation Rises To 15.15 Percent In December 2025

18:56January 15, 2026
Community Journalism

Angry Makoko Residents Take Demolitions Protest To Governor’s Office And State Assembly

18:19January 15, 2026

VIDEO

  • Politics
  • Business & Economy
  • States News
  • National Affairs
  • Climate Change
  • World & Diplomacy
  • Health & Wellness
  • Media & Journalism
jk_last_logo

Your Authentic News Platform

Your Authentic News Platform

  • Politics
  • Business & Economy
  • Climate Change
  • World & Diplomacy
  • Health & Wellness
  • States News
  • National Affairs
  • Media & Journalism
  • Politics
  • Business & Economy
  • Climate Change
  • World & Diplomacy
  • Health & Wellness
  • States News
  • National Affairs
  • Media & Journalism

© 2025 JKNewsMedia.  Powered By WinNet

  • About JKNewMedia
  • Privacy Policy
  • Advertise with us
  • Careers
  • Contact

© 2025 JKNewsMedia.  Powered By WinNet

  • About JKNewMedia
  • Privacy Policy
  • Advertise with us
  • Careers
  • Contact